CDC7005-EVM

Mfr. #: CDC7005-EVM
Hersteller: Texas Instruments
Beschreibung: EVAL BOARD FOR CDC7005 SERIES
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: CDC7005-EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDC7005-EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Clock Synchronizers This product's 800 MHz range is 0Hz to 2.2GHz. The Timing, Clock Synchronizer is the Main-Purpose. Primary-Attributes: - IC package type: CDC7005 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDC7005. SPI interface type

CDC7005-EVM Image

CDC7005-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDC7005-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Clock Synchronizers
  • Frequency 800 MHz
  • Main-Purpose Timing, Clock Synchronizer
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part CDC7005
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDC7005
  • Interface-Type SPI

CDC7005-EVM

CDC7005-EVM Specifications

CDC7005-EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Synchronizers.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 800 MHz

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Synchronizer.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDC7005.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDC7005.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
230,43 $
230,43 $
10
218,91 $
2 189,08 $
100
207,39 $
20 738,70 $
500
195,87 $
97 932,75 $
1000
184,34 $
184 344,00 $
Top