CDCE18005EVM

Mfr. #: CDCE18005EVM
Hersteller: Texas Instruments
Beschreibung: EVALUATION MODULE FOR CDCE18005
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: CDCE18005EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE18005EVM Overview

Product belongs to the - series. The Timing, Clock Buffer / Driver / Receiver / Translator is the Main-Purpose. Primary-Attributes: 3 Inputs, 10 Outputs IC package type: CDCE18005 This tool is designed for the CDCE18005.

CDCE18005EVM Image

CDCE18005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE18005EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Timing, Clock Buffer / Driver / Receiver / Translator
  • Primary-Attributes 3 Inputs, 10 Outputs
  • Embedded No
  • Utilized-IC-Part CDCE18005
  • Tool-Is-For-Evaluation-Of CDCE18005

CDCE18005EVM

CDCE18005EVM Specifications

CDCE18005EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Buffer / Driver / Receiver / Translator.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 3 Inputs, 10 Outputs.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCE18005.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCE18005.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
230,43 $
230,43 $
10
218,91 $
2 189,08 $
100
207,39 $
20 738,70 $
500
195,87 $
97 932,75 $
1000
184,34 $
184 344,00 $
Top