CDCLVP1204EVM

Mfr. #: CDCLVP1204EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR CDCLVP1204
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: CDCLVP1204EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP1204EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDCLVP1204 Minimum operating temperature: - 40 C This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP1204.

CDCLVP1204EVM Image

CDCLVP1204EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP1204EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Frequency 200 MHz 2 GHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCLVP1204
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 2.375 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDCLVP1204

CDCLVP1204EVM

CDCLVP1204EVM Specifications

CDCLVP1204EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Buffers.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 200 MHz 2 GHz

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Buffer.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCLVP1204.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2.375 V to 3.6 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCLVP1204.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
172,52 $
172,52 $
10
163,89 $
1 638,89 $
100
155,26 $
15 526,35 $
500
146,64 $
73 318,90 $
1000
138,01 $
138 012,00 $
Top