CDCLVP1216EVM

Mfr. #: CDCLVP1216EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR CDCLVP1216
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: CDCLVP1216EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP1216EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers Bulk is the packaging method for this product This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer is the Main-Purpose. Primary-Attributes: - IC package type: CDCLVP1216 This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP1216.

CDCLVP1216EVM Image

CDCLVP1216EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP1216EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 200 MHz 2 GHz
  • Main-Purpose Timing, Clock Buffer
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part CDCLVP1216
  • Operating-Supply-Voltage 2.375 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDCLVP1216

CDCLVP1216EVM

CDCLVP1216EVM Specifications

CDCLVP1216EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Buffers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 200 MHz 2 GHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCLVP1216.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.375 V to 3.6 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCLVP1216.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
172,52 $
172,52 $
10
163,89 $
1 638,89 $
100
155,26 $
15 526,35 $
500
146,64 $
73 318,90 $
1000
138,01 $
138 012,00 $
Top