DAC5672EVM

Mfr. #: DAC5672EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DAC5672
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DAC5672EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5672EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This tool is designed for the DAC5672. I2C SMA interface type

DAC5672EVM Image

DAC5672EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5672EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Tool-Is-For-Evaluation-Of DAC5672
  • Interface-Type I2C SMA

DAC5672EVM

DAC5672EVM Specifications

DAC5672EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC5672.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
223,50 $
223,50 $
10
212,32 $
2 123,25 $
100
201,15 $
20 115,00 $
500
189,98 $
94 987,50 $
1000
178,80 $
178 800,00 $
Top