DAC5689EVM

Mfr. #: DAC5689EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DAC5689
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DAC5689EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5689EVM Overview

This product is categorized as Evaluation Modules Type: DAC This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the DAC5689. USB interface type

DAC5689EVM Image

DAC5689EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5689EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Modules
  • Type DAC
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of DAC5689
  • Interface-Type USB

DAC5689EVM

DAC5689EVM Specifications

DAC5689EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC5689

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
560,79 $
560,79 $
10
532,75 $
5 327,50 $
100
504,71 $
50 471,10 $
500
476,67 $
238 335,75 $
1000
448,63 $
448 632,00 $
Top