DAC8411EVM

Mfr. #: DAC8411EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DAC8411
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DAC8411EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8411EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 1.8 V to 5.5 V supply voltage for reliable performance. This tool is designed for the DAC8411. SPI interface type

DAC8411EVM Image

DAC8411EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8411EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 1.8 V to 5.5 V
  • Tool-Is-For-Evaluation-Of DAC8411
  • Interface-Type SPI

DAC8411EVM

DAC8411EVM Specifications

DAC8411EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V to 5.5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC8411

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top