DAC8541EVM

Mfr. #: DAC8541EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MOD FOR DAC8541
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DAC8541EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8541EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 1.8 V to 5.5 V supply voltage for reliable performance. This tool is designed for the DAC8541.

DAC8541EVM Image

DAC8541EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8541EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 1.8 V to 5.5 V
  • Tool-Is-For-Evaluation-Of DAC8541

DAC8541EVM

DAC8541EVM Specifications

DAC8541EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 5.5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8541.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
148,50 $
148,50 $
10
141,08 $
1 410,75 $
100
133,65 $
13 365,00 $
500
126,22 $
63 112,50 $
1000
118,80 $
118 800,00 $
Top