Product Details
DAC8550EVM Overview

This product is categorized as Evaluation Boards Type: DAC This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8550. SPI interface type

DAC8550EVM Image

DAC8550EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8550EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8550
  • Interface-Type SPI

DAC8550EVM

DAC8550EVM Specifications

DAC8550EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8550.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top