DAC8564EVM

Mfr. #: DAC8564EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DAC8564
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DAC8564EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8564EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8564. SPI interface type

DAC8564EVM Image

DAC8564EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8564EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8564
  • Interface-Type SPI

DAC8564EVM

DAC8564EVM Specifications

DAC8564EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8564.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
31,40 $
31,40 $
10
29,83 $
298,25 $
100
28,26 $
2 825,55 $
500
26,69 $
13 342,90 $
1000
25,12 $
25 116,00 $
Top