DLPDLCR2010EVM-PCB

Mfr. #: DLPDLCR2010EVM-PCB
Hersteller: Texas Instruments
Beschreibung: EVALUATION MODULE
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DLPDLCR2010EVM-PCB Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DLPDLCR2010EVM-PCB Overview

RoHS compliant with Details This product is categorized as Evaluation Modules The DLP2010 ADSP-2189M, enabling fast and efficient testing. The 5 V is 15 V. Interface Type: Audio HDMI

DLPDLCR2010EVM-PCB Image

DLPDLCR2010EVM-PCB

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DLPDLCR2010EVM-PCB Specifications
  • Manufacturer Texas Instruments
  • Product Category Accessories
  • RoHS Details
  • Brand Texas Instruments
  • Product Evaluation Modules
  • Tool Is For Evaluation Of DLP2010
  • Operating Supply Voltage 5 V
  • Interface Type Audio HDMI

DLPDLCR2010EVM-PCB

DLPDLCR2010EVM-PCB Specifications

DLPDLCR2010EVM-PCB FAQ
  • A: What is the RoHS of the product?

    Q: The RoHS of the product is Details.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Tool Is For Evaluation Of?

    Q: Yes, the product's Tool Is For Evaluation Of is indeed DLP2010

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V

  • A: At what frequency does the Interface Type?

    Q: The product Interface Type is Audio HDMI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
373,50 $
373,50 $
10
354,82 $
3 548,25 $
100
336,15 $
33 615,00 $
500
317,48 $
158 737,50 $
1000
298,80 $
298 800,00 $
Top