DRV110EVM

Mfr. #: DRV110EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DRV110
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DRV110EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV110EVM Overview

Product belongs to the DRV110 series. This product is categorized as Evaluation Modules Type: Current Mode PWM Controllers Bulk is the packaging method for this product This product is designed DRV110 DRV120 amplifier. The Power Management, Solenoid Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV110 Maximum operating temperature of + 35 C Minimum operating temperature: - 40 C This product is an DRV110A 14-pin TSSOP. This tool is designed for the DRV110 DRV120. Input Voltage Range: 7 V to 48 V 100 V to 240 V

DRV110EVM Image

DRV110EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV110EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV110
  • Product Evaluation Modules
  • Type Current Mode PWM Controllers
  • Packaging Bulk
  • For-Use-With DRV110 DRV120
  • Main-Purpose Power Management, Solenoid Control
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part DRV110
  • Maximum-Operating-Temperature + 35 C
  • Minimum-Operating-Temperature - 40 C
  • Description-Function DRV110A 14-pin TSSOP
  • Tool-Is-For-Evaluation-Of DRV110 DRV120
  • Input-Voltage 7 V to 48 V 100 V to 240 V

DRV110EVM

DRV110EVM Specifications

DRV110EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DRV110

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Current Mode PWM Controllers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV110 DRV120.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Solenoid Control.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV110.

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 35 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is DRV110A 14-pin TSSOP.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV110 DRV120.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 7 V to 48 V 100 V to 240 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
113,04 $
113,04 $
10
107,39 $
1 073,88 $
100
101,74 $
10 173,60 $
500
96,08 $
48 042,00 $
1000
90,43 $
90 432,00 $
Top