DRV2700EVM

Mfr. #: DRV2700EVM
Hersteller: Texas Instruments
Beschreibung: EVAL BOARD FOR DRV2700
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DRV2700EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV2700EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Piezoelectric IC package type: DRV2700 Output voltage: 200 V This product is an DRV2700 high voltage piezo driver evaluation module board. This tool is designed for the DRV2700. GUI interface type Input Voltage Range: 3.6 V to 5.5 V

DRV2700EVM Image

DRV2700EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV2700EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Management Specialized
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Piezoelectric
  • Embedded -
  • Utilized-IC-Part DRV2700
  • Output-Voltage 200 V
  • Description-Function DRV2700 high voltage piezo driver evaluation module board
  • Tool-Is-For-Evaluation-Of DRV2700
  • Interface-Type GUI
  • Input-Voltage 3.6 V to 5.5 V

DRV2700EVM

DRV2700EVM Specifications

DRV2700EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Management Specialized

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Piezoelectric

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV2700.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 200 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed DRV2700 high voltage piezo driver evaluation module board

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV2700.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is GUI.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 3.6 V to 5.5 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
223,50 $
223,50 $
10
212,32 $
2 123,25 $
100
201,15 $
20 115,00 $
500
189,98 $
94 987,50 $
1000
178,80 $
178 800,00 $
Top