DRV601EVM

Mfr. #: DRV601EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DRV601
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DRV601EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV601EVM Overview

Product belongs to the DirectPath series. Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 1.8 V ~ 4.5 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV601 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV601.

DRV601EVM Image

DRV601EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV601EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series DirectPath
  • Type Audio Amplifiers
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 1.8 V ~ 4.5 V
  • Max-Output-Power-x-Channels-Load -
  • Amplifier-Type Class AB
  • Supplied-Contents Board
  • Utilized-IC-Part DRV601
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DRV601

DRV601EVM

DRV601EVM Specifications

DRV601EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DirectPath.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifiers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed 2-Channel (Stereo)

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 1.8 V ~ 4.5 V.

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is -.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Class AB.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV601.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV601.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
114,63 $
114,63 $
10
108,90 $
1 088,98 $
100
103,17 $
10 316,70 $
500
97,44 $
48 717,75 $
1000
91,70 $
91 704,00 $
Top