DRV612EVM

Mfr. #: DRV612EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DRV612
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DRV612EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV612EVM Overview

Product belongs to the DirectPath series. Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 3.6 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV612 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV612.

DRV612EVM Image

DRV612EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV612EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series DirectPath
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 3 V ~ 3.6 V
  • Max-Output-Power-x-Channels-Load -
  • Amplifier-Type Class AB
  • Supplied-Contents Board
  • Utilized-IC-Part DRV612
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DRV612

DRV612EVM

DRV612EVM Specifications

DRV612EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DirectPath

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 2-Channel (Stereo).

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 3 V ~ 3.6 V.

  • A: What is the Max-Output-Power-x-Channels-Load of the product?

    Q: The Max-Output-Power-x-Channels-Load of the product is -.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class AB.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV612.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV612.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
114,63 $
114,63 $
10
108,90 $
1 088,98 $
100
103,17 $
10 316,70 $
500
97,44 $
48 717,75 $
1000
91,70 $
91 704,00 $
Top