DRV632EVM

Mfr. #: DRV632EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DRV632
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DRV632EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV632EVM Overview

Product belongs to the DirectPath series. This product is categorized as Evaluation Modules Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 3.6 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV632 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV632. 25 mA is 92 nA.

DRV632EVM Image

DRV632EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV632EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series DirectPath
  • Product Evaluation Modules
  • Type Audio Amplifiers
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 3 V ~ 3.6 V
  • Max-Output-Power-x-Channels-Load -
  • Amplifier-Type Class AB
  • Supplied-Contents Board
  • Utilized-IC-Part DRV632
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DRV632
  • Operating-Supply-Current 25 mA

DRV632EVM

DRV632EVM Specifications

DRV632EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DirectPath.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifiers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 2-Channel (Stereo).

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 3 V ~ 3.6 V

  • A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?

    Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed -

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Class AB.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV632.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV632.

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 25 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
114,63 $
114,63 $
10
108,90 $
1 088,98 $
100
103,17 $
10 316,70 $
500
97,44 $
48 717,75 $
1000
91,70 $
91 704,00 $
Top