| Mfr. #: | DRV8804EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | EVAL MODULE FOR DRV8804 |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | DRV8804EVM Datenblatt |


Product belongs to the - series. This product is categorized as Evaluation Modules The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: 4 Channel Low-Side Driver IC package type: DRV8804 Maximum operating temperature of + 85 C This tool is designed for the DRV8804. USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8804EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Main-Purpose?
Q: The product Main-Purpose is Power Management, Motor Control, Stepper.
A: Is the cutoff frequency of the product Primary-Attributes?
Q: Yes, the product's Primary-Attributes is indeed 4 Channel Low-Side Driver
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed DRV8804
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 85 C.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8804
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is USB.