DRV8830EVM

Mfr. #: DRV8830EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DRV8830
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DRV8830EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8830EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Single-H-Bridge Driver, 1A IC package type: DRV8830 This tool is designed for the DRV8830. I2C interface type Output current: 1 A

DRV8830EVM Image

DRV8830EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8830EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Management Specialized
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Single-H-Bridge Driver, 1A
  • Embedded No
  • Utilized-IC-Part DRV8830
  • Tool-Is-For-Evaluation-Of DRV8830
  • Interface-Type I2C
  • Output-Current 1 A

DRV8830EVM

DRV8830EVM Specifications

DRV8830EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Single-H-Bridge Driver, 1A.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8830.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8830

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 1 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top