DRV8833EVM

Mfr. #: DRV8833EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR DRV8833
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: DRV8833EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8833EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Power Management Specialized Bulk is the packaging method for this product The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: Stepper or Single/Dual Brushed DC Motor, 2A Peek IC package type: DRV8833 This tool is designed for the DRV8833. Output current: 1.5 A

DRV8833EVM Image

DRV8833EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8833EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Power Management Specialized
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes Stepper or Single/Dual Brushed DC Motor, 2A Peek
  • Embedded No
  • Utilized-IC-Part DRV8833
  • Tool-Is-For-Evaluation-Of DRV8833
  • Output-Current 1.5 A

DRV8833EVM

DRV8833EVM Specifications

DRV8833EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Management Specialized.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control, Stepper.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Stepper or Single/Dual Brushed DC Motor, 2A Peek

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8833

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8833

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 1.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top