HDC1000EVM

Mfr. #: HDC1000EVM
Hersteller: Texas Instruments
Beschreibung: Sensor Development Tools Temperature Sensor Development Tools HDC1000 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: HDC1000EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
HDC1000EVM Overview

Product belongs to the HDC1000 series. This product is categorized as Evaluation Kits Type: Humidity Temperature Sensors Sensitivity: ±0.2°C, ±3% Interface: I2C Voltage Supply Range: - Humidity, Temperature Sensing range of -20°C ~ 85°C, 0 ~ 100% RH Included item: Board. IC package type: HDC1000 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the HDC1000. I2C USB interface type

HDC1000EVM Image

HDC1000EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

HDC1000EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series HDC1000
  • Product Evaluation Kits
  • Type Humidity Temperature Sensors
  • Sensitivity ±0.2°C, ±3%
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Humidity, Temperature
  • Sensing-Range -20°C ~ 85°C, 0 ~ 100% RH
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part HDC1000
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of HDC1000
  • Interface-Type I2C USB

HDC1000EVM

HDC1000EVM Specifications

HDC1000EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed HDC1000

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: At what frequency does the Type?

    Q: The product Type is Humidity Temperature Sensors.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±0.2°C, ±3%.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C.

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed -

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Humidity, Temperature.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -20°C ~ 85°C, 0 ~ 100% RH

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed HDC1000

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed HDC1000

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
32,58 $
32,58 $
10
30,95 $
309,51 $
100
29,32 $
2 932,20 $
500
27,69 $
13 846,50 $
1000
26,06 $
26 064,00 $
Top