INA149EVM

Mfr. #: INA149EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR INA149
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: INA149EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
INA149EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product Operational temperature range: -40°C ~ 125°C Output-Type: - Voltage supply range: 4 V ~ 36 V, ±2 V ~ 18 V The 500kHz The 5 V/μs. Current-Output-Channel is 25mA The amplifier is of Differential type. Included item: Board. IC package type: INA149 Board type: Fully Populated. The product has 1 - Single channel per IC. This product is an Evaluation Module. This tool is designed for the INA149.

INA149EVM Image

INA149EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA149EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • Operating-Temperature -40°C ~ 125°C
  • Output-Type -
  • Voltage-Supply-Single-Dual 4 V ~ 36 V, ±2 V ~ 18 V
  • -3db-Bandwidth 500kHz
  • Slew-Rate 5 V/μs
  • Current-Output-Channel 25mA
  • Amplifier-Type Differential
  • Supplied-Contents Board
  • Utilized-IC-Part INA149
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 810μA
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of INA149

INA149EVM

INA149EVM Specifications

INA149EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 125°C.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed -

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 4 V ~ 36 V, ±2 V ~ 18 V.

  • A: What is the -3db-Bandwidth of the product?

    Q: The -3db-Bandwidth of the product is 500kHz.

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 5 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 25mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Differential.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is INA149.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation Module.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is INA149.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top