| Mfr. #: | LDC1312EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | EVAL MODULE FOR LDC1312 |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | LDC1312EVM Datenblatt |


Product belongs to the LDC1312 series. This product is categorized as Evaluation Modules Type: Inductance to Digital Bulk is the packaging method for this product Sensitivity: - Interface: USB Voltage Supply Range: 5V, USB Proximity, Inductive Sensing range of - Included item: Board. IC package type: LDC1312 This tool is designed for the LCD1312.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDC1312EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is LDC1312.
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: What is the Type of the product?
Q: The Type of the product is Inductance to Digital.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is -.
A: What is the Interface of the product?
Q: The Interface of the product is USB.
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed 5V, USB
A: Is the cutoff frequency of the product Sensor-Type?
Q: Yes, the product's Sensor-Type is indeed Proximity, Inductive
A: What is the Sensing-Range of the product?
Q: The Sensing-Range of the product is -.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is LDC1312.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LCD1312