LM5175EVM-HP

Mfr. #: LM5175EVM-HP
Hersteller: Texas Instruments
Beschreibung: EVALUATION MODULE LM5175 HP
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LM5175EVM-HP Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM5175EVM-HP Overview

Product belongs to the - series. This product is categorized as Design Software This product is designed LM5175 amplifier. The DC/DC, Step Up or Down is the Main-Purpose. 6 V ~ 36 V voltage input This product features 'Frequency-Switching' at 260kHz for optimal performance. Output voltage: 12V Buck-Boost regulator topology 120W Included item: Board. IC package type: LM5175 Board type: Fully Populated. The product has 1, Non-Isolated outputs.

LM5175EVM-HP Image

LM5175EVM-HP

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM5175EVM-HP Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Design Software
  • For-Use-With LM5175
  • Main-Purpose DC/DC, Step Up or Down
  • Voltage-Input 6 V ~ 36 V
  • Frequency-Switching 260kHz
  • Current-Output 10A
  • Voltage-Output 12V
  • Regulator-Topology Buck-Boost
  • Power-Output 120W
  • Supplied-Contents Board
  • Utilized-IC-Part LM5175
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated

LM5175EVM-HP

LM5175EVM-HP Specifications

LM5175EVM-HP FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Design Software.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed LM5175

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed DC/DC, Step Up or Down

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 6 V ~ 36 V

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 260kHz.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 12V.

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck-Boost.

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is 120W.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LM5175

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 1, Non-Isolated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
298,50 $
298,50 $
10
283,58 $
2 835,75 $
100
268,65 $
26 865,00 $
500
253,72 $
126 862,50 $
1000
238,80 $
238 800,00 $
Top