LMT90EVM

Mfr. #: LMT90EVM
Hersteller: Texas Instruments
Beschreibung: Sensor Development Tools Temperature Sensor Development Tools LMT90EVM Temp Sensor EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LMT90EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMT90EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 4.5 V ~ 10 V Temperature Sensing range of -40°C ~ 125°C Included item: Board. IC package type: LMT90 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 4.5 V to 10 V supply voltage for reliable performance. This tool is designed for the LMT90.

LMT90EVM Image

LMT90EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT90EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±3°C
  • Interface Analog
  • Voltage-Supply 4.5 V ~ 10 V
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part LMT90
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 4.5 V to 10 V
  • Tool-Is-For-Evaluation-Of LMT90

LMT90EVM

LMT90EVM Specifications

LMT90EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±3°C.

  • A: What is the Interface of the product?

    Q: The Interface of the product is Analog.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 4.5 V ~ 10 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -40°C ~ 125°C.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LMT90.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 125 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 4.5 V to 10 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is LMT90.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
43,50 $
43,50 $
10
41,32 $
413,25 $
100
39,15 $
3 915,00 $
500
36,98 $
18 487,50 $
1000
34,80 $
34 800,00 $
Top