LMX2581EVM

Mfr. #: LMX2581EVM
Hersteller: Texas Instruments
Beschreibung: EVAL BOARD FOR LMX2581
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LMX2581EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMX2581EVM Overview

Product belongs to the LMX2581 series. This product is categorized as Evaluation Boards Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 3760 MHz range is 0Hz to 2.2GHz. The Timing, Frequency Synthesizer is the Main-Purpose. Primary-Attributes: Single Fractional-N PLL with VCO IC package type: LMX2581 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the LMX2581. 300 mA is 92 nA. SMA interface type

LMX2581EVM Image

LMX2581EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMX2581EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series LMX2581
  • Product Evaluation Boards
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 3760 MHz
  • Main-Purpose Timing, Frequency Synthesizer
  • Primary-Attributes Single Fractional-N PLL with VCO
  • Embedded -
  • Utilized-IC-Part LMX2581
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of LMX2581
  • Operating-Supply-Current 300 mA
  • Interface-Type SMA

LMX2581EVM

LMX2581EVM Specifications

LMX2581EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is LMX2581.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Frequency Synthesizers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 3760 MHz.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Frequency Synthesizer.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Single Fractional-N PLL with VCO.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LMX2581

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is LMX2581.

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 300 mA.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SMA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
57,46 $
57,46 $
10
54,59 $
545,92 $
100
51,72 $
5 171,85 $
500
48,85 $
24 422,65 $
1000
45,97 $
45 972,00 $
Top