LP5562EVM

Mfr. #: LP5562EVM
Hersteller: Texas Instruments
Beschreibung: LED Lighting Development Tools LP5562 EVAL MOD
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: LP5562EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LP5562EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Bulk is the packaging method for this product This product is designed LP5562 amplifier. 2.7 V ~ 5.5 V voltage input Current-Output-Channel is - Output voltage: - Included item: Board, Cable. IC package type: LP5562 The product has - outputs. This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. Processor Core: LP5562

LP5562EVM Image

LP5562EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LP5562EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - LED Drivers
  • Series -
  • Product Evaluation Modules
  • Packaging Bulk
  • For-Use-With LP5562
  • Features Programmable
  • Voltage-Input 2.7 V ~ 5.5 V
  • Current-Output-Channel -
  • Voltage-Output -
  • Supplied-Contents Board, Cable
  • Utilized-IC-Part LP5562
  • Outputs-and-Type -
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Core LP5562

LP5562EVM

LP5562EVM Specifications

LP5562EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed LP5562

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 2.7 V ~ 5.5 V

  • A: Is the cutoff frequency of the product Current-Output-Channel?

    Q: Yes, the product's Current-Output-Channel is indeed -

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board, Cable.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is LP5562.

  • A: At what frequency does the Outputs-and-Type?

    Q: The product Outputs-and-Type is -.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.7 V to 5.5 V.

  • A: What is the Core of the product?

    Q: The Core of the product is LP5562.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
86,85 $
86,85 $
10
82,51 $
825,08 $
100
78,16 $
7 816,50 $
500
73,82 $
36 911,25 $
1000
69,48 $
69 480,00 $
Top