OPT3001EVM

Mfr. #: OPT3001EVM
Hersteller: Texas Instruments
Beschreibung: Sensor Development Tools Optical Sensor Development Tools Ambient Light Sensor Eval Board
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: OPT3001EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPT3001EVM Overview

Product belongs to the OPT3001 series. This product is categorized as Evaluation Modules Type: Ambient Light Sensors Bulk is the packaging method for this product Sensitivity: 550nm Interface: I2C Voltage Supply Range: 1.6 V ~ 3.6 V Light, Ambient Sensing range of - Included item: 2 Boards, Cable. IC package type: OPT3001 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 1.6 V to 3.6 V supply voltage for reliable performance. This product is an -. This tool is designed for the OPT3001. I2C USB interface type Our product measures - in dimensions for compact and convenient use.

OPT3001EVM Image

OPT3001EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPT3001EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series OPT3001
  • Product Evaluation Modules
  • Type Ambient Light Sensors
  • Packaging Bulk
  • Sensitivity 550nm
  • Interface I2C
  • Voltage-Supply 1.6 V ~ 3.6 V
  • Sensor-Type Light, Ambient
  • Sensing-Range -
  • Supplied-Contents 2 Boards, Cable
  • Embedded -
  • Utilized-IC-Part OPT3001
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1.6 V to 3.6 V
  • Description-Function -
  • Tool-Is-For-Evaluation-Of OPT3001
  • Interface-Type I2C USB
  • Dimensions -

OPT3001EVM

OPT3001EVM Specifications

OPT3001EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is OPT3001.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Ambient Light Sensors.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is 550nm.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 1.6 V ~ 3.6 V.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Light, Ambient.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards, Cable

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is OPT3001.

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 85 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.6 V to 3.6 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is -.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is OPT3001.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C USB.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed -

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
28,95 $
28,95 $
10
27,50 $
275,03 $
100
26,06 $
2 605,50 $
500
24,61 $
12 303,75 $
1000
23,16 $
23 160,00 $
Top