| Mfr. #: | PGA900EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | EVAL MODULE PGA900 |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | PGA900EVM Datenblatt |


Product belongs to the - series. This product is categorized as Evaluation Board Type: Signal Conditioning Bulk is the packaging method for this product The Interface, Sensor Signal Conditioner is the Main-Purpose. Primary-Attributes: - IC package type: PGA900 Maximum operating temperature of + 150 C Minimum operating temperature: - 40 C This product operates at a 3.3 V to 30 V supply voltage for reliable performance. This product is an Evaluation Baord for Resistive Sensing Conditioner. This tool is designed for the PGA900. I2C interface type Our product measures 5 in x 2.3 in in dimensions for compact and convenient use.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PGA900EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Board
A: What is the Type of the product?
Q: The Type of the product is Signal Conditioning.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Interface, Sensor Signal Conditioner
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is -.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed PGA900
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 150 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 30 V
A: At what frequency does the Description-Function?
Q: The product Description-Function is Evaluation Baord for Resistive Sensing Conditioner.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is PGA900.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is I2C.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 5 in x 2.3 in.