REG710EVM-5

Mfr. #: REG710EVM-5
Hersteller: Texas Instruments
Beschreibung: EVAL MOD FOR REG710-XX
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: REG710EVM-5 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
REG710EVM-5 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Charge Pumps Bulk is the packaging method for this product The DC/DC, Step Up or Down is the Main-Purpose. 2.7 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at 1MHz for optimal performance. Output voltage: 5V Buck-Boost regulator topology - Included item: Board. IC package type: REG710 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 5 V This tool is designed for the REG710. Our product measures 50.8 mm x 50.8 mm in dimensions for compact and convenient use. Input Voltage Range: 2.7 V to 5.5 V

REG710EVM-5 Image

REG710EVM-5

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

REG710EVM-5 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Charge Pumps
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Up or Down
  • Voltage-Input 2.7 V ~ 5.5 V
  • Frequency-Switching 1MHz
  • Current-Output 30mA
  • Voltage-Output 5V
  • Regulator-Topology Buck-Boost
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part REG710
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 5 V
  • Tool-Is-For-Evaluation-Of REG710
  • Dimensions 50.8 mm x 50.8 mm
  • Input-Voltage 2.7 V to 5.5 V

REG710EVM-5

REG710EVM-5 Specifications

REG710EVM-5 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is Charge Pumps.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Up or Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 2.7 V ~ 5.5 V.

  • A: What is the Frequency-Switching of the product?

    Q: The Frequency-Switching of the product is 1MHz.

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 5V

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck-Boost.

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed -

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is REG710.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed REG710

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 50.8 mm x 50.8 mm.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 2.7 V to 5.5 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top