SN65LVCP114EVM

Mfr. #: SN65LVCP114EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR SN65LVCP114
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: SN65LVCP114EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
SN65LVCP114EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Multiplexer / Demultiplexer Switches The Interface, Re-Driver is the Main-Purpose. Primary-Attributes: - IC package type: SN65LVCP114 This product operates at a 2.5 V 3.3 V supply voltage for reliable performance. This tool is designed for the SN65LVCP114. USB interface type

SN65LVCP114EVM Image

SN65LVCP114EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

SN65LVCP114EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Multiplexer / Demultiplexer Switches
  • Main-Purpose Interface, Re-Driver
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part SN65LVCP114
  • Operating-Supply-Voltage 2.5 V 3.3 V
  • Tool-Is-For-Evaluation-Of SN65LVCP114
  • Interface-Type USB

SN65LVCP114EVM

SN65LVCP114EVM Specifications

SN65LVCP114EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Multiplexer / Demultiplexer Switches.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Re-Driver

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is SN65LVCP114.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.5 V 3.3 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is SN65LVCP114.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
925,17 $
925,17 $
10
878,91 $
8 789,12 $
100
832,65 $
83 265,30 $
500
786,39 $
393 197,25 $
1000
740,14 $
740 136,00 $
Top