| Mfr. #: | THS1206M-EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | EVALUATION MODULE FOR THS1206M |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | THS1206M-EVM Datenblatt |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 6M. Data-Interface: Parallel 12 bits 1 units Input range: 1.5 ~ 3.5 V Included item: Board. IC package type: THS1206M This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the THS1206.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS1206M-EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the Sampling-Rate-Per-Second?
Q: The product Sampling-Rate-Per-Second is 6M.
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed Parallel
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 12.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 1.
A: At what frequency does the Input-Range?
Q: The product Input-Range is 1.5 ~ 3.5 V.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is THS1206M.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is THS1206.