| Mfr. #: | TMP007EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Sensor Development Tools Temperature Sensor Development Tools Evaluation Module |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TMP007EVM Datenblatt |


Product belongs to the TMP007 series. This product is categorized as Evaluation Modules Type: IR Thermopile Sensors Bulk is the packaging method for this product Sensitivity: - Interface: I2C, SMBus Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards. IC package type: TMP007 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TMP007. I2C SPI interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP007EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is TMP007.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is IR Thermopile Sensors.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is -.
A: At what frequency does the Interface?
Q: The product Interface is I2C, SMBus.
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed -
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Temperature.
A: What is the Sensing-Range of the product?
Q: The Sensing-Range of the product is -.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is 2 Boards.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TMP007
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TMP007.
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed I2C SPI