| Mfr. #: | TMP108EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Sensor Development Tools Temperature Sensor Development Tools TMP108 EVAL MOD |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TMP108EVM Datenblatt |


Product belongs to the - series. This product is categorized as Evaluation Boards Sensitivity: ±1°C Interface: I2C, SMBus, USB Voltage Supply Range: 1.4 V ~ 3.6 V Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP108 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP108. I2C USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP108EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is ±1°C.
A: At what frequency does the Interface?
Q: The product Interface is I2C, SMBus, USB.
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 1.4 V ~ 3.6 V.
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Temperature.
A: What is the Sensing-Range of the product?
Q: The Sensing-Range of the product is -40°C ~ 125°C.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is 2 Boards, Cables.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TMP108
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V 3.3 V
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP108
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed I2C USB