| Mfr. #: | TMP122EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Sensor Development Tools Temperature Sensor Development Tools TMP122 Eval Mod |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TMP122EVM Datenblatt |


Product belongs to the - series. Sensitivity: ±0.5°C Interface: SPI Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 150°C Included item: Board. IC package type: TMP122

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP122EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is ±0.5°C.
A: What is the Interface of the product?
Q: The Interface of the product is SPI.
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed 2.7 V ~ 5.5 V
A: Is the cutoff frequency of the product Sensor-Type?
Q: Yes, the product's Sensor-Type is indeed Temperature
A: Is the cutoff frequency of the product Sensing-Range?
Q: Yes, the product's Sensing-Range is indeed -55°C ~ 150°C
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TMP122