TMP451EVM

Mfr. #: TMP451EVM
Hersteller: Texas Instruments
Beschreibung: Sensor Development Tools Temperature Sensor Development Tools TMP451 EVAL MOD
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TMP451EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP451EVM Overview

Product belongs to the TMP451 series. This product is categorized as Evaluation Modules Type: Temperature Sensors Sensitivity: ±1°C Interface: I2C Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards, Cables. IC package type: TMP451 This product operates at a 1.8 V 3.3 V supply voltage for reliable performance. This tool is designed for the TMP451. I2C SPI interface type

TMP451EVM Image

TMP451EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP451EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series TMP451
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Sensitivity ±1°C
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -
  • Supplied-Contents 2 Boards, Cables
  • Embedded -
  • Utilized-IC-Part TMP451
  • Operating-Supply-Voltage 1.8 V 3.3 V
  • Tool-Is-For-Evaluation-Of TMP451
  • Interface-Type I2C SPI

TMP451EVM

TMP451EVM Specifications

TMP451EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is TMP451.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensors.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±1°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is -.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards, Cables.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP451

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V 3.3 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP451

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
86,85 $
86,85 $
10
82,51 $
825,08 $
100
78,16 $
7 816,50 $
500
73,82 $
36 911,25 $
1000
69,48 $
69 480,00 $
Top