| Mfr. #: | TMP708EVM |
|---|---|
| Hersteller: | Texas Instruments |
| Beschreibung: | Sensor Development Tools Temperature Sensor Development Tools TMP708 Eval Mod |
| Lebenszyklus: | Neu von diesem Hersteller. |
| Datenblatt: | TMP708EVM Datenblatt |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP708 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP708.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP708EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Temperature Sensors.
A: Is the cutoff frequency of the product Sensitivity?
Q: Yes, the product's Sensitivity is indeed ±3°C
A: What is the Interface of the product?
Q: The Interface of the product is Analog.
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 2.7 V ~ 5.5 V.
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Thermostat.
A: At what frequency does the Sensing-Range?
Q: The product Sensing-Range is 0°C ~ 125°C.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is TMP708.
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 2.7 V to 5.5 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is TMP708.