TMP709EVM

Mfr. #: TMP709EVM
Hersteller: Texas Instruments
Beschreibung: Sensor Development Tools Temperature Sensor Development Tools TMP709 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TMP709EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP709EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP709 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP709.

TMP709EVM Image

TMP709EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP709EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Boards
  • Type Temperature Sensors
  • Sensitivity ±3°C
  • Interface Analog
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Thermostat
  • Sensing-Range 0°C ~ 125°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP709
  • Maximum-Operating-Temperature + 125 C
  • Operating-Supply-Voltage 2.7 V to 5.5 V
  • Tool-Is-For-Evaluation-Of TMP709

TMP709EVM

TMP709EVM Specifications

TMP709EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±3°C.

  • A: What is the Interface of the product?

    Q: The Interface of the product is Analog.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 2.7 V ~ 5.5 V.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Thermostat.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed 0°C ~ 125°C

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP709

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 125 C

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.7 V to 5.5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TMP709.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
63,42 $
63,42 $
10
60,25 $
602,49 $
100
57,08 $
5 707,80 $
500
53,91 $
26 953,50 $
1000
50,74 $
50 736,00 $
Top