TPA0242EVM

Mfr. #: TPA0242EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MOD PWR AMP FOR TPA0242
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPA0242EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA0242EVM Overview

Product belongs to the - series. Output-Type: 2-Channel (Stereo) with Stereo Headphones Voltage Supply Range: 4.5 V ~ 5.5 V Maximum Output Power of 2.8W x 2 @ 3 Ohm for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: TPA0242 Board type: Fully Populated.

TPA0242EVM Image

TPA0242EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA0242EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series -
  • Output-Type 2-Channel (Stereo) with Stereo Headphones
  • Voltage-Supply 4.5 V ~ 5.5 V
  • Max-Output-Power-x-Channels-Load 2.8W x 2 @ 3 Ohm
  • Amplifier-Type Class AB
  • Supplied-Contents Board
  • Utilized-IC-Part TPA0242
  • Board-Type Fully Populated

TPA0242EVM

TPA0242EVM Specifications

TPA0242EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is 2-Channel (Stereo) with Stereo Headphones.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 4.5 V ~ 5.5 V.

  • A: Is the cutoff frequency of the product Max-Output-Power-x-Channels-Load?

    Q: Yes, the product's Max-Output-Power-x-Channels-Load is indeed 2.8W x 2 @ 3 Ohm

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Class AB.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPA0242.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
0,00 $
0,00 $
10
0,00 $
0,00 $
100
0,00 $
0,00 $
500
0,00 $
0,00 $
1000
0,00 $
0,00 $
Top