TPL0501EVM

Mfr. #: TPL0501EVM
Hersteller: Texas Instruments
Beschreibung: LED Lighting Development Tools TPL0501 EVAL MOD
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPL0501EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPL0501EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product This product is designed TPL0501 amplifier. The Digital Potentiometer is the Main-Purpose. Primary-Attributes: 1 Channel, 256 Position IC package type: TPL0501 This product operates at a 5.5 V supply voltage for reliable performance.

TPL0501EVM Image

TPL0501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPL0501EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • For-Use-With TPL0501
  • Main-Purpose Digital Potentiometer
  • Primary-Attributes 1 Channel, 256 Position
  • Embedded No
  • Utilized-IC-Part TPL0501
  • Operating-Supply-Voltage 5.5 V

TPL0501EVM

TPL0501EVM Specifications

TPL0501EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TPL0501.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Digital Potentiometer.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 1 Channel, 256 Position

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPL0501

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
30,00 $
30,00 $
10
28,50 $
285,00 $
100
27,00 $
2 700,00 $
500
25,50 $
12 750,00 $
1000
24,00 $
24 000,00 $
Top