TPS2115EVM

Mfr. #: TPS2115EVM
Hersteller: Texas Instruments
Beschreibung: EVAL MOD FOR TPS2115
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS2115EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2115EVM Overview

Product belongs to the - series. The Power Management, Power Distribution Switch (Load Switch) is the Main-Purpose. Primary-Attributes: - IC package type: TPS2115

TPS2115EVM Image

TPS2115EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2115EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Power Management, Power Distribution Switch (Load Switch)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TPS2115

TPS2115EVM

TPS2115EVM Specifications

TPS2115EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Power Distribution Switch (Load Switch)

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS2115.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top