TPS51218EVM-496

Mfr. #: TPS51218EVM-496
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR TPS51218
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS51218EVM-496 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS51218EVM-496 Overview

Product belongs to the D-CAP series. This product is categorized as Evaluation Boards Type: Switching Controllers Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 8 V ~ 14 V voltage input This product features 'Frequency-Switching' at 380kHz for optimal performance. Output voltage: 1.2V Buck regulator topology - Included item: Board. IC package type: TPS51218 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 1.2 V This tool is designed for the TPS51218. Input Voltage Range: 8 V to 14 V

TPS51218EVM-496 Image

TPS51218EVM-496

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS51218EVM-496 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series D-CAP
  • Product Evaluation Boards
  • Type Switching Controllers
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 8 V ~ 14 V
  • Frequency-Switching 380kHz
  • Current-Output 20A
  • Voltage-Output 1.2V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS51218
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 1.2 V
  • Tool-Is-For-Evaluation-Of TPS51218
  • Input-Voltage 8 V to 14 V

TPS51218EVM-496

TPS51218EVM-496 Specifications

TPS51218EVM-496 FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is D-CAP.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Switching Controllers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 8 V ~ 14 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 380kHz

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 1.2V

  • A: At what frequency does the Regulator-Topology?

    Q: The product Regulator-Topology is Buck.

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS51218

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 1.2 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS51218.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 8 V to 14 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top