TPS61199EVM-598

Mfr. #: TPS61199EVM-598
Hersteller: Texas Instruments
Beschreibung: LED Lighting Development Tools TPS61199 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS61199EVM-598 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61199EVM-598 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules This product is designed Backlight LCD Displays amplifier. 8 V ~ 30 V voltage input Current-Output-Channel is 65mA Output voltage: - Included item: Board. IC package type: TPS61199 The product has 8, Non-Isolated outputs. This product operates at a 8 V to 30 V supply voltage for reliable performance. Output current: 480 mA Processor Core: TPS61199

TPS61199EVM-598 Image

TPS61199EVM-598

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61199EVM-598 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - LED Drivers
  • Series -
  • Product Evaluation Modules
  • For-Use-With Backlight LCD Displays
  • Features -
  • Voltage-Input 8 V ~ 30 V
  • Current-Output-Channel 65mA
  • Voltage-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS61199
  • Outputs-and-Type 8, Non-Isolated
  • Operating-Supply-Voltage 8 V to 30 V
  • Output-Current 480 mA
  • Core TPS61199

TPS61199EVM-598

TPS61199EVM-598 Specifications

TPS61199EVM-598 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is Backlight LCD Displays.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 8 V ~ 30 V.

  • A: Is the cutoff frequency of the product Current-Output-Channel?

    Q: Yes, the product's Current-Output-Channel is indeed 65mA

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TPS61199

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 8, Non-Isolated

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 8 V to 30 V.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 480 mA.

  • A: At what frequency does the Core?

    Q: The product Core is TPS61199.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top