TPS61200EVM-179

Mfr. #: TPS61200EVM-179
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR TPS61200
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS61200EVM-179 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61200EVM-179 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Up or Down is the Main-Purpose. 0.3 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: 3.3V Boost regulator topology - Included item: Board. IC package type: TPS61200 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the TPS61200. Our product measures 33 mm x 29.2 mm in dimensions for compact and convenient use. Input Voltage Range: 0.3 V to 5.5 V

TPS61200EVM-179 Image

TPS61200EVM-179

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61200EVM-179 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Up or Down
  • Voltage-Input 0.3 V ~ 5.5 V
  • Frequency-Switching -
  • Current-Output 600mA
  • Voltage-Output 3.3V
  • Regulator-Topology Boost
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS61200
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TPS61200
  • Dimensions 33 mm x 29.2 mm
  • Input-Voltage 0.3 V to 5.5 V

TPS61200EVM-179

TPS61200EVM-179 Specifications

TPS61200EVM-179 FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Up or Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 0.3 V ~ 5.5 V.

  • A: What is the Frequency-Switching of the product?

    Q: The Frequency-Switching of the product is -.

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 3.3V

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Boost

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed -

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS61200.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 1, Non-Isolated.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS61200.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 33 mm x 29.2 mm

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 0.3 V to 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top