TPS61230EVM-089

Mfr. #: TPS61230EVM-089
Hersteller: Texas Instruments
Beschreibung: EVAL BOARD BOOST REG TPS61230
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS61230EVM-089 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61230EVM-089 Overview

Product belongs to the TPS61230 series. This product is categorized as Evaluation Modules Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Up is the Main-Purpose. 2.3 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: 5V Boost regulator topology - Included item: Board. IC package type: TPS61230 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 5 V This tool is designed for the TPS61230. Input Voltage Range: 3.6 V Output current: 2.1 A

TPS61230EVM-089 Image

TPS61230EVM-089

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61230EVM-089 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series TPS61230
  • Product Evaluation Modules
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Up
  • Voltage-Input 2.3 V ~ 5.5 V
  • Frequency-Switching -
  • Current-Output 2.1A
  • Voltage-Output 5V
  • Regulator-Topology Boost
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS61230
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 5 V
  • Tool-Is-For-Evaluation-Of TPS61230
  • Input-Voltage 3.6 V
  • Output-Current 2.1 A

TPS61230EVM-089

TPS61230EVM-089 Specifications

TPS61230EVM-089 FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is TPS61230.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Up.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 2.3 V ~ 5.5 V

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed -

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 5V

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Boost.

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPS61230.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPS61230.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 3.6 V

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 2.1 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top