TPS63036EVM-163

Mfr. #: TPS63036EVM-163
Hersteller: Texas Instruments
Beschreibung: EVAL MODULE FOR TPS63036-163
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS63036EVM-163 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS63036EVM-163 Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Up or Down is the Main-Purpose. 1.8 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at 2MHz for optimal performance. Output voltage: 3.3V Buck-Boost regulator topology - Included item: Board. IC package type: TPS63036 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the TPS63036. Input Voltage Range: 1.8 V to 5.5 V Output current: 600 mA

TPS63036EVM-163 Image

TPS63036EVM-163

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS63036EVM-163 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Modules
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Up or Down
  • Voltage-Input 1.8 V ~ 5.5 V
  • Frequency-Switching 2MHz
  • Current-Output 600mA
  • Voltage-Output 3.3V
  • Regulator-Topology Buck-Boost
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS63036
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TPS63036
  • Input-Voltage 1.8 V to 5.5 V
  • Output-Current 600 mA

TPS63036EVM-163

TPS63036EVM-163 Specifications

TPS63036EVM-163 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is DC/DC, Step Up or Down.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed 1.8 V ~ 5.5 V

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is 2MHz.

  • A: What is the Voltage-Output of the product?

    Q: The Voltage-Output of the product is 3.3V.

  • A: At what frequency does the Regulator-Topology?

    Q: The product Regulator-Topology is Buck-Boost.

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed -

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS63036.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS63036.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 1.8 V to 5.5 V.

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 600 mA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top