TPS65161EVM-194

Mfr. #: TPS65161EVM-194
Hersteller: Texas Instruments
Beschreibung: EVAL MOD FOR TPS65161
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TPS65161EVM-194 Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65161EVM-194 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Power Management Specialized Bulk is the packaging method for this product The Special Purpose DC/DC, LCD Supply is the Main-Purpose. 11.4 V ~ 12.6 V voltage input This product features 'Frequency-Switching' at 750kHz for optimal performance. Output voltage: 3.3V, 18V, 32V, -5V Buck-Boost regulator topology 32.8W Included item: Board. IC package type: TPS65161 Board type: Fully Populated. The product has 4, Non-Isolated outputs. This tool is designed for the TPS65161. Our product measures 96.5 mm x 63.5 mm in dimensions for compact and convenient use. Input Voltage Range: 15 V

TPS65161EVM-194 Image

TPS65161EVM-194

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65161EVM-194 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Power Management Specialized
  • Packaging Bulk
  • Main-Purpose Special Purpose DC/DC, LCD Supply
  • Voltage-Input 11.4 V ~ 12.6 V
  • Frequency-Switching 750kHz
  • Current-Output 2.3A, 1.3A, 50mA, 50mA
  • Voltage-Output 3.3V, 18V, 32V, -5V
  • Regulator-Topology Buck-Boost
  • Power-Output 32.8W
  • Supplied-Contents Board
  • Utilized-IC-Part TPS65161
  • Board-Type Fully Populated
  • Outputs-and-Type 4, Non-Isolated
  • Tool-Is-For-Evaluation-Of TPS65161
  • Dimensions 96.5 mm x 63.5 mm
  • Input-Voltage 15 V

TPS65161EVM-194

TPS65161EVM-194 Specifications

TPS65161EVM-194 FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Management Specialized

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Special Purpose DC/DC, LCD Supply.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 11.4 V ~ 12.6 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 750kHz

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 3.3V, 18V, 32V, -5V

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck-Boost

  • A: At what frequency does the Power-Output?

    Q: The product Power-Output is 32.8W.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS65161.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 4, Non-Isolated.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPS65161.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 96.5 mm x 63.5 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 15 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top