TSC2005EVM

Mfr. #: TSC2005EVM
Hersteller: Texas Instruments
Beschreibung: TSC2005EVM
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TSC2005EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2005EVM Overview

Product belongs to the - series. The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2005

TSC2005EVM Image

TSC2005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2005EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces
  • Embedded No
  • Utilized-IC-Part TSC2005

TSC2005EVM

TSC2005EVM Specifications

TSC2005EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Touch Screen Controller

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TSC2005.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
92,08 $
92,08 $
10
87,48 $
874,81 $
100
82,88 $
8 287,65 $
500
78,27 $
39 136,15 $
1000
73,67 $
73 668,00 $
Top