TSC2006EVM-PDK

Mfr. #: TSC2006EVM-PDK
Hersteller: Texas Instruments
Beschreibung: Sensor Development Tools Touch Sensor Development Tools TSC2006EVM-PDK Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TSC2006EVM-PDK Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2006EVM-PDK Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2006 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TSC2006.

TSC2006EVM-PDK Image

TSC2006EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2006EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Kits
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces
  • Embedded No
  • Utilized-IC-Part TSC2006
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TSC2006

TSC2006EVM-PDK

TSC2006EVM-PDK Specifications

TSC2006EVM-PDK FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Kits.

  • A: What is the Type of the product?

    Q: The Type of the product is Resistive Touch Sensors.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Touch Screen Controller

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TSC2006

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2006

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
111,26 $
111,26 $
10
105,69 $
1 056,92 $
100
100,13 $
10 012,95 $
500
94,57 $
47 283,40 $
1000
89,00 $
89 004,00 $
Top