TSC2111EVM

Mfr. #: TSC2111EVM
Hersteller: Texas Instruments
Beschreibung: Sensor Development Tools Touch Sensor Development Tools TSC2111 Eval Mod
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TSC2111EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2111EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Resistive Touch Sensors The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces IC package type: TSC2111 This product operates at a 2.7 V supply voltage for reliable performance. This tool is designed for the TSC2111.

TSC2111EVM Image

TSC2111EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2111EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Resistive Touch Sensors
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces
  • Embedded No
  • Utilized-IC-Part TSC2111
  • Operating-Supply-Voltage 2.7 V
  • Tool-Is-For-Evaluation-Of TSC2111

TSC2111EVM

TSC2111EVM Specifications

TSC2111EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Resistive Touch Sensors

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Touch Screen Controller.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 4-Wire Resistive Touch Screen Controller, I2C and SPI Interfaces.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TSC2111.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.7 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TSC2111

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
0,00 $
0,00 $
10
0,00 $
0,00 $
100
0,00 $
0,00 $
500
0,00 $
0,00 $
1000
0,00 $
0,00 $
Top