TSW2170EVM

Mfr. #: TSW2170EVM
Hersteller: Texas Instruments
Beschreibung: EVALUATION BOARD FOR TSW2170
Lebenszyklus: Neu von diesem Hersteller.
Datenblatt: TSW2170EVM Datenblatt
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW2170EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product The Timing, Clock Generator is the Main-Purpose. Primary-Attributes: - IC package type: - This product operates at a 5 V supply voltage for reliable performance. This product is an Signal generator evaluation module for Texas Instruments ADCs. This tool is designed for the -.

TSW2170EVM Image

TSW2170EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW2170EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Main-Purpose Timing, Clock Generator
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part -
  • Operating-Supply-Voltage 5 V
  • Description-Function Signal generator evaluation module for Texas Instruments ADCs
  • Tool-Is-For-Evaluation-Of -

TSW2170EVM

TSW2170EVM Specifications

TSW2170EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Generator.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed -

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Signal generator evaluation module for Texas Instruments ADCs.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed -

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Menge
Stückpreis
ext. Preis
1
172,52 $
172,52 $
10
163,89 $
1 638,89 $
100
155,26 $
15 526,35 $
500
146,64 $
73 318,90 $
1000
138,01 $
138 012,00 $
Top